Bridge House

Project Name: Bridge House
Location: Richmond
Description

  • The project building comprised of four floors all of which were required to be air conditioned.
  • The systems consisted of two number ducted air cooled condensers located in the building roof plant room
  • Each floor was equipped with ceiling void mounted fan coil units discharging into perimeter slot diffusers, with additional floor mounted fan coil units  located at alcove positions
  • The systems were served from refrigerant pipe work dropping / rising in a purposed designed mechanical riser shaft with radial distribution pipe work and circuitry concealed within the ceiling void space.
  • All floors were designated their own control system, and floors could be set to individual requirements as conditions or preference’s dictate.
  • The entire system including the controls element were installed and commissioned by aura construction engineers and full on site instruction given to incoming maintenance and building management personnel with a full twelve months warranty and on site assistance.
  • The project was completed within program, on budget and to the complete satisfaction of client.